Twenty poles, five utilities, four weeks

Client
Gas utility, WA
Role
Joint-use engineer
Scope
20 pole sites
Status
Delivered

A gas utility committed to installing AMI meter-reading radios across Western Washington and needed approvals for 20 pole attachments spanning multiple electric utilities and jurisdictions, on a four-week clock. Our team delivered every submittal package on time.

Field data collection at an attachment site.
Field data collection at an attachment site.

FIELD TO SUBMITTAL, FAST

Immediate field data collection at each location, followed by pole loading and clearance analysis and the drawings each jurisdiction required for approval.

Attachment detail from a submittal package.
Attachment detail from a submittal package.

Twenty poles, five utilities, four weeks. Joint use rewards the prepared.

BOTTOM LINE

  • A client needed twenty jurisdiction-ready packages in a month.
  • Our team collected, analyzed, and shipped all twenty.

FROM THE SUBMITTAL PACKAGES

Pole loading analysis, attachment site
Pole loading analysis, attachment site
Clearance evaluation detail
Clearance evaluation detail
Attachment construction detail
Attachment construction detail
Field data collection summary
Field data collection summary
Make-ready analysis
Make-ready analysis
Submittal package drawing
Submittal package drawing