FLAGSHIP · 2024–26

A greenfield substation, delivered on plan

Client
Electric cooperative, WA
Role
Owner's engineer / PM
Scope
$10M program
Status
Construction

An electric cooperative is building a new 115 kV substation, plus the transmission and distribution work around it, to serve fast-growing load. They needed one firm keeping design, procurement, and construction moving as a single program. Our team serves as the owner’s program manager and engineer.

Foundations and steel stubs across the yard, August 2026.
Foundations and steel stubs across the yard, August 2026.

WHAT WE CARRY

  • Master schedule across substation, transmission, and distribution
  • Procurement of the power transformer, relay panels, reclosers, and switches
  • Coordination of the design, protection, geotechnical, survey, and construction firms
  • Monthly cost control the board can read in one page
  • Commissioning plan through energization

The board sees where every dollar and every week stands, reconciled to the penny, every month.

Transformer foundation cured and ready for the fall set.
Transformer foundation cured and ready for the fall set.

WHERE IT STANDS

Foundations are in, steel is standing, and the transformer sets this fall. The program is tracking to an energization target of year end.

BOTTOM LINE

  • A client needed a substation built without surprises.
  • Our team runs the program like the money is our own.